Air-conditioning Inspections           

Air-conditioning inspections will affect all existing building (with air-con) in England and Wales. Air-conditioning systems where the total system cooling capacity is greater than 12kw whether in dwellings or non-dwellings will need to be inspected at intervals not exceeding 5 years.
The requirements for inspections are laid out below:

4 Jan 2009 – First inspection of all existing air-conditioning systems over 250kw must have occurred by this date.

4 Jan 2011 – First inspection of all remaining air-conditioning systems over 12kw must have occurred by this date.

If you require a quotation or are not sure if you are affected by this new legislation, please call our dedicated team who will be happy to help.

.

 